2000 - The history of CMI dates back to the year 2000 when the Spanish company Miesa created it to execute several cogeneration projects for three new hotels under construction in the Uvero Alto-Bávaro area of the Dominican Republic. 2001.- We built a fourth cogeneration plant within the Hotel Fiesta Bávaro with a production of 12 MW to supply energy to several hotels in the area. 2002.- CMI is consolidated as a company of services of construction of industrial facilities within the hotel area. We expand our range of services with Operation and Maintenance of power plants. 2003.- A collaboration agreement is established with Carrier-Technical Assistance to cover the supply and maintenance needs of cold generation plants. 2004-2007.- CMI executes comprehensive projects for industrial services in the hotel sector in the Caribbean area, mainly covering the countries of the Dominican Republic and Mexico. 2008-2010 The following were executed IP CCTV Security System for Iberostar Club House. Installation of Smoke Detection systems in Majestic Colonial Punta Cana and Elegance Hotels. Hoteles Barceló.
[vc_gallery type=»nivo» interval=»3″ images=»1143,1144,1142,1150,1151,1146,1147,1148,1149,1165,1164,1163″ img_size=»600×533″]
PROYECTS
Expansion of the Cold Platform for Barceló Hotels.
Installation of low voltage network 460/208/120V 60Hz. for Majestic Colonial Punta Cana and Elegance Hotels.
Installation of Voice and Data Network and optical TV for Hotel Majestic Elegance.
Installation of Total Medium Voltage Ring 4 transformer stations for Hotel Majestic Elegance.
Instalación de Anillo de Media Tensión total 7 estaciones transformadoras para Hotel Majestic Colonial Punta Cana.
Installation of Steam Boiler for Iberostar Hotels.
Installation of ACS Boiler for Iberostar Hotels.
Installation of ACS Boilers for Hotel Sirenis Cocotal.
Installation of ACS Boilers for Hotel Excellence Punta Cana.
Cogeneration plant in Bavaro 12.2 MW.
Cogeneration Plant in Sirenis *Hotels 4.5 MW.
Cogeneration Plant at Hotel Secrets Excellence 3 MW.
Cogeneration Plant at Hotel Carabela 4.5 MW.
Cold Platforms in Princess Hotels, Fiesta, *Paradisus.
Assembly of Volvo Hotel Luperon Generating Plants.
*Generation Plant Hotel Sunscape 4.5 MW.
IberoStar II Generation Plant 3 MW.
Emergency Plant Hotel Mar Taino.
Installation electric ring of MT Hotel *Sunscape and Distribution in BT.
Installation of MT Electric Ring and Distribution in BT for Hotel Majestic.
Interconnection Electrical Ring Power Generation Plants in Fiesta, Princess, IberoStar Hotels.Clients
Consorcio Energético Punta Cana-Macao (CEPM).
Hotel Excellence Punta Cana.
Hotel Bahía Príncipe.
Invermax SA.
Banco Sabadell.
Hotel Palladium Bavaro.
Hoteles Princess.
Fiesta Resorts.
Hoteles IberoStar.
Hoteles Sirenis Resort.
Hoteles Dreams.
Hoteles Majestic.
Hotel Luperon.
Hoteles Meliá.